Forklift traffic, chemical spills, freeze-thaw cycles, and 24/7 operations — your warehouse floor faces it all. We install heavy-duty epoxy, MMA, and polyurea systems that hold up for decades without slowing your business down.
Unsealed warehouse concrete degrades fast under forklift traffic, pallet jacks, and chemical exposure. The result: concrete dust that clogs machinery, potholes that damage product and equipment, slip hazards that put your WorkSafeBC compliance at risk, and a facility that fails client walk-throughs.
A properly specified industrial epoxy or polyurea system eliminates all of that. It creates a dense, seamless, impervious surface that's faster to sweep, safer to navigate, and easier to maintain — often for 15 to 25 years without recoating.
Not every warehouse has the same needs. We assess your traffic loads, chemical exposure, temperature range, and downtime window — then specify the system that fits.
Our most popular industrial system. No solvents, 4–6 mm build, outstanding chemical and abrasion resistance. Handles petroleum, battery acid, and most hydraulic fluids. Available with anti-slip aggregate broadcast.
Walk-on in 4–6 hours, drive-on in 24. UV stable so it won't yellow at dock doors. Extremely flexible — absorbs impact and minor concrete movement. Ideal for facilities that cannot afford a 72-hour shutdown.
The only industrial coating that cures reliably in sub-zero temperatures. Returns to service in 60–90 minutes. The go-to choice for cold storage, freezer warehouses, and facilities that can't maintain above-5°C during installation.
WorkSafeBC and OSHA-compliant pedestrian lanes, forklift corridors, hazard zones, and rack bay markings. Applied with the same durable epoxy topcoat — not tape that peels and becomes a trip hazard.
Our industrial flooring crews have worked in virtually every type of heavy-use facility across the Lower Mainland. If your floor takes a beating, we've coated one like it.
We coordinate installs around your production schedule — Friday-night starts, phased sections, overnight crews. The goal is always the same: your team walks in Monday morning to a finished floor, not a work in progress.
We diamond-grind every slab to CSP 3–4 and repair all cracks, spalls, and joint failures before a single drop of coating is applied. No shortcuts.
All installs include a site safety plan. Our crew holds WHMIS, Fall Protection, and Confined Space certifications relevant to industrial environments.
"We needed our 12,000 sq ft distribution floor done over a long weekend without disrupting Monday morning receiving. Deluxe Coating started Friday at 6 PM and had the entire floor — plus safety line markings — complete by Sunday noon. The crew was professional, the prep work was thorough, and the floor has held up flawlessly through two years of daily forklift traffic."
Liam T.We'll visit your facility, assess the slab condition, understand your operational constraints, and provide a detailed quote — at no cost and no obligation. Most quotes delivered within 24 hours.